Auspicious symbol area

Announcement of the second section of Quxing Town, Xiangfu District, Kaifeng City comprehensive utilization of land space + rural revitalization and high-standard farmland construction (Phase I) project

Release time: 2024-06-24 15:10:15 Number of page views: Author: Kaifeng Public resources trading information Network

Comprehensive utilization of land space in Quxing Town, Xiangfu District, Kaifeng City+Rural revitalization and high-standard farmland construction (Phase I) project second section bid announcement

Henan Hongshenghuo whole process Project Management Co., Ltd. was commissioned by Kaifeng Xinnong Zhengmao Ecological Agriculture Development Co., LTD., on the comprehensive utilization of land space in Quxing Town, Xiangfu District, Kaifeng City+The rural revitalization and high-standard farmland construction (Phase I) project is open to tender2024621Bid opening and evaluation activities were carried out in accordance with the law in the Public Resources Trading Center of Xiangfu District, Kaifeng City。The bid evaluation committee conducted the evaluation in accordance with the provisions of the bidding documents, and confirmed by the tenderer, the bid evaluation results are now publicized as follows:

1. Description of the bidding project

1.1Project name: Comprehensive utilization of land space in Quxing Town, Xiangfu District, Kaifeng City+Rural revitalization and high-standard farmland construction (Phase I) project

1.2Project Number:HSH-GSGK-2024-0430

1.3Construction site: Xiangfu District, Kaifeng City

1.4Project Overview and construction content: This project mainly includes Quxing Town high-standard farmland construction project, the comprehensive utilization of national land space project, agricultural science and innovation service center (village-level agricultural service center) and other projects。Among them, the bidding project and construction content is Quxing Town2023High standard farmland demonstration transformation and upgrading projects:

(1) High-standard farmland construction projects

Project to be constructed10000Acres of high-standard farmland。The main construction contents include:

(1)Land transfer: transfer or land trusteeship and other operational services for part of the land involved in the project。

(2)Soil productivity improvement project: including soil layer stripping and backfilling, embankment construction, earthwork backfilling, ploughing and finishing, soil management, soil deep loosening and soil fertility cultivation (bio-organic fertilizer);

(3)Irrigation and drainage projects: including irrigation stations, ponds (DAMS), agricultural Wells, pumping stations, dredging ditches, canal system buildings, efficient water-saving irrigation projects, etc.

(4)Field road engineering: including machine road and production road engineering;

(5)Farmland protection projects: including shelterbelts, bank slope protection;

(6)Farmland power transmission and distribution project: including distribution room, low voltage line;

(7)Smart agricultural information engineering: including comprehensive management center,5GBase station, information equipment, field positioning monitoring site construction, etc.;

(8)Other works。

1.5Source of funds and Investment: Enterprise self-financing, approx25080万元。Among them: The bidding amount: approx3300万元。

1.6Construction period requirements: the first section:Design period: from the date of signing the contract30The preliminary design of the works shall be completed within calendar days;The completion time of construction drawing design and budget preparation shall be determined by the owner through consultation with the winning bidder according to the project progress。Construction period: six months from the date of signing the contract (press180Calendar days);

Section 2: From the date when the contract is signed and takes effect to the date when the project is completed, acceptance, settlement and other matters are completed;

Section 3: same construction period (including defect liability period))

1.7Bidding scope: The first part of the bid: the whole process management of the project survey, design (construction drawing design, etc.), construction, material procurement, completion acceptance, handover, completion filing, defect repair and warranty services within the project defect liability period and all the contents specified in the bidding documents。Includes but is not limited to the following:1.Engineering survey, construction drawing design, follow-up construction cooperation, etc.;2.Project construction and procurement (including all construction contents and materials, equipment, facilities within the scope of the construction drawings of the project procurement, installation, commissioning) and other related content, and in accordance with the standards and regulations to complete the completion of acceptance, trial operation, project handover and completion of the record, defect repair within the responsibility period of engineering defects, warranty services;3.Other contents that should be included in the scope of the general contract of the project;

Section 2: Provide engineering consulting services including preliminary consultation, cost, project management (including project approval and construction application), project post-evaluation and other related aspects of the construction project's preliminary research and decision-making and the whole life cycle of project implementation;

The third bidding section: the whole process supervision service in the construction stage。

1.8Quality requirements: The first section quality requirements:

1Design quality standards: meet the current national and local survey and design standards, and ensure the final approval (if the standards are inconsistent, the higher one shall prevail);

2Construction quality standards: in line with the national, industry and local relevant construction acceptance standards, acceptance;

Quality requirements of the second bidding section: comply with the relevant national, industrial and local laws and regulations, norms and technical standards, and meet the service requirements of the tenderer;

Quality requirements of the third bidding section: meet the requirements of current national norms and technical standards。

1.9The division of the bidding section

2.1The project is divided into three sections:

Section 1:EPC(设计+Construction) general contract;

Section 2: Project management consulting services;

Section 3: Project supervision service。

2.2Bidding control price: one bid section: design fee maximum price (rate quote) : completion audit final price2.0%

The maximum price of construction and installation fee (rate quote) : the final price of completion audit100%

Section II: the final settlement price of the actual investment of the project3.5%

Section three: construction and installation costs of the project1.5%

二、Bidder qualification requirements

2.1The bidder has independent legal personality and valid business license;

2.2Bidders or consortium members should have engineering consulting professional credit grade A (construction) or comprehensive credit grade A, with early consulting, project management, project cost business expertise, personnel and capabilities;

2.3Personnel requirements:

1The general person in charge of the project to be dispatched by the bidder shall have the qualification of national registered first-level construction engineer or registered supervision engineer or registered cost engineer or consulting engineer (investment), and have the technical title of deputy senior (including) or above;

2The person in charge of the preliminary consultation of the project to be dispatched by the bidder shall have the qualification of consulting engineer (investment) and the technical title of deputy senior (including) or above;

3The person in charge of the project management to be assigned by the bidder shall have the certificate of registered supervision engineer or national registered Class I construction engineer, and have the technical title of deputy senior (including) or above;

4The person in charge of the project cost consulting to be dispatched by the bidder shall have the certificate of national registered first-level cost engineer, and have the technical title of deputy senior (including) or above;

It is proposed to send the general director of the project, the preliminary consulting director, the project management director, the project cost consulting director to provide from202361Social security certification materials paid by the enterprise for any consecutive three months since the beginning of the day;

2.4Financial requirements: Provided2022Annual OR2023The annual financial report audited by an accounting firm, the newly established company less than one year to provide its basic bank credit certificate issued in the past three months;

2.5Reputation requirements: Bidders listed in the record list of untrustworthy persons subject to enforcement, major tax law and untrustworthy subjects, and serious illegal and untrustworthy behaviors of government procurement shall refuse to participate in the bidding of this project;【 Inquiry channel: China Executive Information Disclosure Network (http://zxgk.court.gov.cn/shixin/) inquire about persons subject to enforcement for dishonesty;"Credit China" website (www.creditchina.gov.cn) Inquire about major tax violations and dishonest subjects;China Government Procurement Website (www.ccgp.gov.cnQuery the list of records of serious illegal and dishonest acts of government procurement 】 (The query date is after the announcement date, if the consortium is formed to bid, all members of the consortium need to provide)。

2.6The person in charge of the unit is the same person or different units that have a holding and management relationship may not participate in the same bid at the same time;[Provide the letter of commitment, and provide the relevant materials queried in the "National Enterprise Credit Information Publicity System" (including the company's basic information, shareholder information and equity change information);]

2.7The second section of the project accepts the bid of the consortium, and the consortium members require:

2.7.1The bidder must be an independent legal entity registered in accordance with the law or a consortium composed of different legal entities, but the number of members in the consortium shall not exceed2Home, should meet the following requirements:

1If a consortium participates, it shall submit the consortium agreement and indicate the work and responsibilities to be undertaken by the leader and the parties, and promise that the parties to the consortium will bear joint and several liabilities to the tenderer once the contract is concluded;

2If members of a consortium with similar qualifications undertake the same work according to the division of labor of the consortium, the qualification level shall be determined according to the lower qualification level of the consortium members;

3Where a consortium participates in the bidding activities, the parties to the consortium may not participate in the bidding activities under the same contract separately or form a consortium with other consortium members;

4The consortium leader must be the project management unit。The legal representative of the lead or its authorized agent is responsible for signing the relevant documents of the bidding activity. If it needs to be sealed, the lead shall seal the official seal of the unit. All parties to the consortium must sign the consortium agreement to approve it.

5In the form of a consortium to participate in the bidding activities, the leader must be in the Kaifeng public resources electronic trading service platform member system CA Digital certificate registration, consortium members do not need to register。

Iii. Number of bid Evaluation Committee members:5人。     

Iv. Bid evaluation

Zhonghuan Construction(北京)Engineering Management Company Limited:The performance does not meet the requirements of the bidding documents。If the bid fails the conformity check, it shall be treated as invalid bid。

There are less than three valid bidders, so the bid section is lost。

5. Other contents of publicity stipulated in the bidding documents

      无。

6. Publishing media

The bidding announcement was released on the "China Tendering and Bidding Public Service Platform", "Henan Electronic Tendering and Bidding Public Service Platform" and "Kaifeng Public Resources Trading Information Network" at the same time。

Channels and methods for raising objections

According to the BianPublic Administration Office (202013The document stipulates that if the bidder has objections to the above results, it can raise objections to the tenderer on the public resources trading information network cable in Kaifeng City during the publicity period, and the overdue will no longer be accepted, and the tenderer should be from the date of receipt of the objection3Reply within days,If the objector still has objections to the reply or the tenderer fails to make a reply within the prescribed time, the objector may do so on the date of publicity10Within days (objection reply period does not count) in the Kaifeng public resources trading information network online complaint。(In the important document column of the Kaifeng public resources trading information website, there are text formats and requirements for objections and complaints of construction projects)。

8. Contact information

Tenderer: Kaifeng Xinnong Zhengmao Ecological Agriculture Development Co., LTD

    Address: Quxing Town People's Government, Xiangfu District, Kaifeng City, Henan Province

Contact: Ms. Tian

Contact information:18639879050

Bidding agency: Henan Hongshenghuo whole process Project Management Co., LTD

Address: Jingyi Road, Xiangfu District, Kaifeng City

Contact: Ms. Xiang

Contact information:0371-26625885

Contact information of administrative supervision department

Supervision unit: Kaifeng Xiangfu District construction project bidding Management Office

    话:0371-26668106

 


All rights reserved:Kaifeng city public resources trading information networkHost: Kaifeng public resources trading information network
Address: Kaifeng City citizens home 5th floor 邮编:475000 Email: kfggzyjyzx2018@163.com Website record number:Yu ICP prepared No. 12001764-1

Technical support:Zhengzhou Xinyuan Information Technology Co., LTD